Shed Build - Part 2 - Formwork & Slab Pour

26th April 2023

It all happened at once. It seemed that as soon as the old mango tree had been taken away as a pile of woodchips, we had the concreter coming to prepare the site for his formwork. 

If you’ve been following along, you’ll know that I’ve been keen to get the shed happening since we moved in to the new house in December of last year. Things had finally settled down in February after my partner Jade had gone back to work and I became a stay-at-home Dad to my son Emmet. 

Long story short, the slab was poured last week on the 20th of April and I’ve been capturing what I can with the new camera. I’ve uploaded a video to my personal YouTube account since I want to make a longer form video for the Lannix Design channel in the future. Please enjoy!

Finally, the slab is down!

2 thoughts on “Shed Build – Part 2”

  1. Pingback: Shed Build – Part 1 – Lannix 3D

  2. Pingback: Design For 3D Printing – CAD Tips – Lannix 3D

Comments are closed.